Oct 18, 2015 #1 SyedZainAli Mechanical Joined May 28, 2011 Messages 27 Location SA Is it possible to perform RT for the steam pipes size NPS 2 that are drawn from header in a fired boiler deisgned on Section 1
Is it possible to perform RT for the steam pipes size NPS 2 that are drawn from header in a fired boiler deisgned on Section 1