chrissyd
Mechanical
- Jun 30, 2006
- 22
I checked a drawing in to PDM for the first time. I have the revision scheme set up as: 00.0 for primary and seconday and 00 for tertiary. Once the part/drawing are released it will read A.0 00, but for right now reads 00.0 00. The tertiary is there only as a ticker for check-ins. I made minor changes to the drawing, saved and checked it back in. In the vault the revision is now 00.0 01, like it should be. When I check this drawing back out into my work space, I am asked if I want to overide the file that is already there? And I click "yes". However, the drawing opens up and in the title block the revision level still remains at 00.00 00, even though the minor changes I made are there. Is this something that needs to be fixed in the properties of my drawing format? Has anyone experienced this?