dozer
Structural
- Apr 9, 2001
- 506
We've torqued a nut to 560 N-m onto a M20 Class 10.9 stud. We would like to back the nut off, adjust the depth of the stud and torque the nut back down. The stud has not seen any additional load since torqueing the nut.
Is this acceptable or should we throw the nut and/or the stud away and try again?
Is this acceptable or should we throw the nut and/or the stud away and try again?