I do not know if other alternatives are applicable or not ( such as increase the base ftg length to 4.0 m, extent the ftg to the back side to get wt of soil for resisting OT and sliding ..)
If this is the only option, i will suggest you to use bored piles with dia 400-500 mm and two rows at the toe and heel with a staggered manner. The spacing of piles could be around 4.0 m
My opinion.
...