EEJaime
Electrical
- Jan 14, 2004
- 536
Strange how this statement does not deny that the wall was built without permit. Further, it admits to having "fully rebuilt" this wall in 2007 including work to "substantially reinforce its foundation". It does not say wether this rebuild was to "engineered plans" or that a "geotechnical expert" ever supervised this work, or in fact wether that re-build was permitted or ever inspected. I think they are in a lot of trouble.