surjaan
Structural
- Nov 20, 2009
- 27
The retaining wall is designed with 2000 psi grout strength at 28 days. The contractor wants to back fill in 7 days. I know the grout will gain about 70% strength in 7 days,should I allow back filling in 7 days or increase the grout strength.