I need to retain the soil for a foundation pit of depth 20m. The soil medium is a homogenous sand (SP-SM) and standart penetration values reach 30 at 10 meters and greater than 50 at 20 meters. The groundwater table is 6 meters from the ground.
The routine procedure in Turkey is to use tangent bored piles tied back by a series of rows of anchors.
However I have some doubts about the watertightness of tangent piles and another concern is the capacity of ground anchors in a saturated sand medium.
I would be thankful for any kind of recommendations.