Dear Sir/s,
I need some help.
I am going to put in service some only Switchgears Panels in action.
I need to know howmuch Voltage I have to inject for power frequency 1 Min test?
These swirchgears was ideal for 5 years as a spare in separate room, Now just I installed.
Its 3.3 KV & 11 KV and 33 KV.
I understand that I have to inject 75% or 80% of the factory test voltage but now its too Old.....So I am worried that howmuch I have to inject?
If I inject only service voltage the is it OK?
Kindly provide your valueable suggestions.
I need some help.
I am going to put in service some only Switchgears Panels in action.
I need to know howmuch Voltage I have to inject for power frequency 1 Min test?
These swirchgears was ideal for 5 years as a spare in separate room, Now just I installed.
Its 3.3 KV & 11 KV and 33 KV.
I understand that I have to inject 75% or 80% of the factory test voltage but now its too Old.....So I am worried that howmuch I have to inject?
If I inject only service voltage the is it OK?
Kindly provide your valueable suggestions.