You often see it straight after the discharge flange as this reduces the velocity in any downstream elbow, especially when the discharge is vertical, but you want the pipe run to be horizontal.
Depends on why you want the reducer there and whether it is making the downstream pipe bigger or smaller. If smaller then costs will be reduced as soon as you make the pipe smaller.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.