Hello all,
I need your advise. I have a situation that rebars for the mat are protruding the construction joint (at the base of the wall). There are wall dowels being fully developed per ACI, but the bar hooks from the mat is protruding through the construction joint by average 2".
What do you think about this?
I need your advise. I have a situation that rebars for the mat are protruding the construction joint (at the base of the wall). There are wall dowels being fully developed per ACI, but the bar hooks from the mat is protruding through the construction joint by average 2".
What do you think about this?