Hi,
New to the board but looking at some other posts i can see that i came to the right place.
Assuming the load on a rail is 2000kN (YES 2000kN) from a wheel, how is the load then transferred on to the concrete slab? The rail has no sleepers but is placed straight onto the concrete slab. I've done smaller works but this is the first time that i've ever had to consider rails.