Hi everyone,
There is a cogeneration plant synchronized with the grid and there is coupling circuit breaker for connection to grid.
When grid further breaker opens, we want to trip the coupling breaker.
Which one of "vector shift relay" and "rate of change of frequency relay" can overcome this protection, or two of them?
Thanks in advance..