jistre
Mechanical
- Oct 1, 2003
- 1,147
I have a S&T HXer with a bit of a problem. I have a repad on the channel nozzles that is relatively large for the channel. The end result is that the repad welds and the girth flange welds come within 1/2" of each other. I have several solutions to the situation, but what I don't have is the section of the BPVC that covers how close those two welds can be. I've gone through the 715 pages of Div 1 and have been unable to find the section of the code that covers this problem. For my report, I'd like to quote the code, but as of yet don't have the citation.
Do any of you guys know where this is addressed in the code? I looked under welding procedures and the procedures for shell and tube exchangers and have seen nothing. So, either I'm looking in the wrong place or my eyes have failed me.
Hopefully, one of you has encountered this before and can point me in the right direction. Thanks a bunch, guys!
Do any of you guys know where this is addressed in the code? I looked under welding procedures and the procedures for shell and tube exchangers and have seen nothing. So, either I'm looking in the wrong place or my eyes have failed me.
Hopefully, one of you has encountered this before and can point me in the right direction. Thanks a bunch, guys!