The main question here is how to qualify a GRE manufacture to be on the approved manufacturers list of the company?
In Iso 14692 - 2, Chapter 6 qualification of the manufacturer is given. It is mainly related to manufacturing part only (which seems fair enough). But the problem starts when there are three parties involved in the design, manufacture and installation of the GRE piping system:
Yes obviously:
1 - Designer (Layout and stress analysis engineers),
2 - Manufacturer of GRE piping materials and fittings,
3 - Construction contractor who installs the GRE piping system at site.
The lack of understanding of the problems of each other gives raise to the trouble of failure in GRE piping system later on (mainly joints).
How to ensure a trouble (failure) free GRE system?
Is it worth to make single source (mainly manufacturer) responsible for all these phases i.e. design, manufacture and installation? Should we include all these factors in qualifying the manufacturer? And how to include these factors in qualifying checklist?
So what is your opinion about it?
The main question here is how to qualify a GRE manufacture to be on the approved manufacturers list of the company?
In Iso 14692 - 2, Chapter 6 qualification of the manufacturer is given. It is mainly related to manufacturing part only (which seems fair enough). But the problem starts when there are three parties involved in the design, manufacture and installation of the GRE piping system:
Yes obviously:
1 - Designer (Layout and stress analysis engineers),
2 - Manufacturer of GRE piping materials and fittings,
3 - Construction contractor who installs the GRE piping system at site.
The lack of understanding of the problems of each other gives raise to the trouble of failure in GRE piping system later on (mainly joints).
How to ensure a trouble (failure) free GRE system?
Is it worth to make single source (mainly manufacturer) responsible for all these phases i.e. design, manufacture and installation? Should we include all these factors in qualifying the manufacturer? And how to include these factors in qualifying checklist?