ispengg
Mechanical
- Sep 2, 2011
- 20
Greetings,
I want to get clarified on PWHT requirement for seamlesss carbon steel piping [not equipment] to avoid Sulfide Stress Cracking [SSC] in refinery sour service.
As per NACE SP 0472 & NACE MR 0103, PWHT is not mandatory requirement for carbon steel to avoid SCC. Hardness control is the key.
1. Most of the literature discuss about Hardened micro structure control & Hardness, but not about the effect of residual stress. Is threshold stress for initiation of SSC is high?.But NACE Tech committee report 8x294 touches this subject.
2. Most of the Process Licencors recommend PWHT of refinery sour service piping, but few of them not.Please give your opinion.
3. Please share your refinery practice, are you doing PWHT for sour service carbon steel piping.
4. If not, did anyone experienced SSC in those pipings?
Thank you...
I want to get clarified on PWHT requirement for seamlesss carbon steel piping [not equipment] to avoid Sulfide Stress Cracking [SSC] in refinery sour service.
As per NACE SP 0472 & NACE MR 0103, PWHT is not mandatory requirement for carbon steel to avoid SCC. Hardness control is the key.
1. Most of the literature discuss about Hardened micro structure control & Hardness, but not about the effect of residual stress. Is threshold stress for initiation of SSC is high?.But NACE Tech committee report 8x294 touches this subject.
2. Most of the Process Licencors recommend PWHT of refinery sour service piping, but few of them not.Please give your opinion.
3. Please share your refinery practice, are you doing PWHT for sour service carbon steel piping.
4. If not, did anyone experienced SSC in those pipings?
Thank you...