We are planning on installing a pump skid that had a pressure transmitter on the outlet for control. The outlet pipe will be chsrdged to a set point then the pump will stop and the system will remain charged to this pressure. When a valve is opened further downstream the pressure will drop and be sensed by the pressure transmitter which will start the vsd on the pump.
My question is how to work out the time lag between the downstream valve being opened and the vsd kicking in?
Thanks
My question is how to work out the time lag between the downstream valve being opened and the vsd kicking in?