martin888888
Civil/Environmental
We have a waste water treatment plan in the design phase with yard piping consisting of sanitary and stormwater. In these types of sitauations where you are building a public facility I would assume that the presiding jurisdiction would want you to follow their public works standards for piping construction instead of the building code. Anyone have any insight into this?