Hi
Can anyone tell me step by step guide to dynamic simulation with PSS/E activities for the following case,
1 Tripping of a generator
2 Three phase earth fault at a bus (say 220 kv) what are the critical clearing times that are widely used.
Can anyone tell me step by step guide to dynamic simulation with PSS/E activities for the following case,
1 Tripping of a generator
2 Three phase earth fault at a bus (say 220 kv) what are the critical clearing times that are widely used.