PSS/E Dynamic simulation 1

Status
Not open for further replies.

mngmng

Electrical
Sep 22, 2008
9
Hi
Can anyone tell me step by step guide to dynamic simulation with PSS/E activities for the following case,

1 Tripping of a generator
2 Three phase earth fault at a bus (say 220 kv) what are the critical clearing times that are widely used.


 
Replies continue below

Recommended for you

I am no expert on this subject. But I have a feeling if you post how many steps you have taken, you may receive a direction to further steps from others in the know.

No one is here to work for you.
 
Ok,
Shall I put my question this way,
1 I prepaired the case for stability run
( I have 7 generators in my case)

2 saved the case for pssds4

3 From pssds4 entry point I did following;

4 perform base stability run
I choose rotor angle of generators for the channel 1 to 6
(My case has 7 generators I'm going to trip one)

5 run the case. Then upto what time I have to run( value for Tpause) to trip a generator ? 0 or 1 second
 