Hi,
I have a case where the builder has constructed the connection as shown below. In this situation, would the coach screw act as a second bolt with regards to plying forces? Or should I be considering this a single bolt connection? If the latter is the case, how should one go about calculating this?
Thanks in advance
I have a case where the builder has constructed the connection as shown below. In this situation, would the coach screw act as a second bolt with regards to plying forces? Or should I be considering this a single bolt connection? If the latter is the case, how should one go about calculating this?

Thanks in advance
