inventor187
Mechanical
I am working for a company that is currently implementing Iso 9001 with new management. We have gone from a job shop to a full blown corporation within a year. Our objective is to get an MRP system up and running and it seems like each department has their own ideas and delemas with our current way of business. We are currently having an issue with our simplest engineering drawings. Engineering is currently creating a drawing that has multiple operations (in-house and/or outsourced) to get the part completed, ex. machining, painting, marking detail. This saves the Engineering group time and errors due to when a CN is needed one drawing can be updated rather than multiple drawings for the same part. However, with one basic drawing number it confuses our system and personel which step in the process we are at when dealing with different batched lots. I believe each process of the part can be entered into the MRP system creating the BOM which will lead to the direction to follow. However I have been given two options, one is to create different drawing numbers for each process of the part or create a suffix for each process and create a matrix table on the face of the one drawing. I am looking for alternative methods and how other companies get around this issue.