Hey Guys,
I have a oil treater pressure vessel I want to add in 2 nozzles. The reason I'm doing this is because we have some corrosion we want to cut out and replace it with a nozzle instead of a flush patch to waive the complete hydro test of the vessel and stick with a local hydro test. Could someone point me in the right direction as to where I would find and example procedure or something of the type to build a procedure for this.
I have a oil treater pressure vessel I want to add in 2 nozzles. The reason I'm doing this is because we have some corrosion we want to cut out and replace it with a nozzle instead of a flush patch to waive the complete hydro test of the vessel and stick with a local hydro test. Could someone point me in the right direction as to where I would find and example procedure or something of the type to build a procedure for this.