Problem when merge 3 project(*.DON) into one in PLS-CADD

Status
Not open for further replies.

blueshadow007

Structural
Joined
Jan 10, 2011
Messages
7
Location
CA
Good evening,

when i "load DON file or merger project" for three projects, then "merge" the "seleted line" with "piceked line", all the structures
can be shown in the staking table. But the structures from one project can not be choosen useing "structure modify".

Can anybody explain what the problem is? Thanks a lot.
 
Call PLS Tech Support, they are always helpful. I just do structural support for PLS-CADD and don't know much about the line design and merge, but if I had to guess I would say that the merged structures are not on the alignment for your original line. I would try to open the 3D window and select the structure you want to modify.

_____________________________________
I have been called "A storehouse of worthless information" many times.
 