Hi
We are manufacturing a water pipe stop (either a blank or a head welded to a weld neck App 2 flange) where a valve is removed and it is designed/manufactured to ASME VIII Div 1. The inner diameter is ~700mm and the design pressure is 3500 kPa. We want to follow the flange to head path, due to the massive blind that will be required otherwise.
Is there any way we can avoid doing a hydrotest?
Thanks
We are manufacturing a water pipe stop (either a blank or a head welded to a weld neck App 2 flange) where a valve is removed and it is designed/manufactured to ASME VIII Div 1. The inner diameter is ~700mm and the design pressure is 3500 kPa. We want to follow the flange to head path, due to the massive blind that will be required otherwise.
Is there any way we can avoid doing a hydrotest?
Thanks