Spagedy
Civil/Environmental
- May 15, 2013
- 1
i have to prepare a panel schedule for a 120/208V schedule . i do not have much electrical backround yet. i have list of loads and a template but i just want tips or advice on how to go about approching the problem. maybe a link of a useful site?