SteelPE
Structural
- Mar 9, 2006
- 2,759
As the question states, I am wondering what the preferred method is for designing a foundation embed plate to a foundation all? Code is IBC 2015 and the plate will be used to connect beams and girders to a foundation wall (plate will be set vertically in the wall). The intent is to cast the plate in place during construction.
My usual method is to set the beam in a pocket on the wall, but foundation detailing this condition is a bit of a pain. I am hoping to simplify the detail process by designing some cast in place embed plates. In this instance most of the loads are around 20kips allowable. I do have a few instance where the load is 45k allowable (64k factored).
I have designed a few of these in the past using the PCI design handbook (I have an old 5th edition here). My other option is to use Hilti Profis. It seems like Profis is the way to go as it seems to make quick work of the problem.
My usual method is to set the beam in a pocket on the wall, but foundation detailing this condition is a bit of a pain. I am hoping to simplify the detail process by designing some cast in place embed plates. In this instance most of the loads are around 20kips allowable. I do have a few instance where the load is 45k allowable (64k factored).
I have designed a few of these in the past using the PCI design handbook (I have an old 5th edition here). My other option is to use Hilti Profis. It seems like Profis is the way to go as it seems to make quick work of the problem.