I am reviewing shops for a project designed by another engineer. The floor framing is precast planks sitting on support inside the web of the W30 bms (I hate always hated this detail). The precaster is asking if he can cut off about 4'-6" portion of half the top flange to slip in his planks and then he would weld flange back on. I can't see any other way for him to be able to install the planks but I am very nervous about how to approach this. If I give him the go ahead, I am going to ask: 1) The bm be shored until the work is done, 2) Cut the flange starting about a 1' from the end of the bm.
But how on earth is he going to restore a full pen weld when there is plank on one side of the flange? Has anyone run into this issue before.
Thanks,
Kaiser