rittz
Structural
- Dec 30, 2007
- 200
I have a client who wants to put up a pre-eng building on cast in place concrete piles without grade beams and without a concrete floor. On an existing asphalt paved area. The frames span 60 ft and spaced at 25 f oc t. I don’t like it. Am I right?