Hello

I am trying to do a stormwater management / drainage report per city of Paterson, NJ requirements that includes the following:

- Pre and post development runoff calculations for runoff for 2 and 25 yr storms.
- Design stormwater management facilities zero net increase in runoff rate for the 2 and 25 year, one hour storms.
- Design stormwater management facilities (detention ponds, control structures, seepage pits, etc) per Residential SIte Improvement Standards NJAC 5:21.

Please help! i'm right out of school and is the first time for me doing this in my new job. Any contribution?

Thank you!


 
Replies continue below

Recommended for you

Rational Method is a very poor way to develop hydrographs for a storage analysis, regardless of the site's size.

Hydrology, Drainage Analysis, Flood Studies, and Complex Stormwater Litigation for Atlanta and the South East -
 
SMIAH : shouldn't I be using the watershed area instead with a weighted Runoff coefficient?
 
Yes if you only change a percentage of the 7500 sq feet.

e.g. 2500/7500 sq feet x 0.45 + 5000/7500 sq feet x 0.15 ...
 