Bilegan
Electrical
- Oct 7, 2008
- 47
What is the purpose of a PMS GPS clock? If it is required, what are the parameters to be considered?
We will design the electrical system of an additional complex in an existing facility. The PMS will supervise, control and monitor the operation of HV/LV X'formers, switchgears, MCC's, and UPS in the new S/S and PIB's. The additional complex will require 2 new S/S, and they are 500 meters apart. One of the new S/S will derived its source from an existing S/S, 1.5kM, via underground cables, the existing S/S is equipped with PDMS.
Bilegan
We will design the electrical system of an additional complex in an existing facility. The PMS will supervise, control and monitor the operation of HV/LV X'formers, switchgears, MCC's, and UPS in the new S/S and PIB's. The additional complex will require 2 new S/S, and they are 500 meters apart. One of the new S/S will derived its source from an existing S/S, 1.5kM, via underground cables, the existing S/S is equipped with PDMS.
Bilegan