jncza
Electrical
- Apr 12, 2004
- 11
We have a hydro generation station comprising of 3 generators generating 3Mw each.We ensure that the kvars(leading or lagging) generated is always less than half of the kva generated to ensure a powerfactor close to unity.We supply our own process plant with an average load of 7,5Mw.The powerfactor at the plant varies between 0,83 to 0,87.When we synchronise to the national grid the meters at the grid substation read a poor powerfactor of 0,40.The powerfactor at the plant still reads 0.87 .Why the big difference?.