fabengr
Structural
- Nov 29, 2009
- 30
I have two separate contracts where the owner / owner’s engineer is requiring us to plug a misslocated hole. We have a repair procedure written based on information we pull from the AWS D1.1. One of the customers is now asking us for the PQR for the work done to make the repair to the base metal. From the research I have done in documents like AWS, ASTM A6 and AISC N690 (this is a nuclear project) the plugging of a hole is not a joint repair. It is in fact a repair to base metal where welding is used.
Is there any guidance in published literature that someone can guide me too for additional information?
Is there any guidance in published literature that someone can guide me too for additional information?