If the planned reinforcement is a mesh, how can you be planning on laying it either parallel to, or perpendicularly to the future water flow?
75 mm seems very thin for a concrete spillway cover that must resist vibration, water hammer on the whole structure as the water impacts at the bottom, etc. : How have you planned to resist those forces?
There's relatively little resistance right at the concrete-to-water flowing surface across the top of a spillway, but tremendous loads imposed back onto the spillway from the impact loads on the bottom.