I recently found the following sentences on the records of lessons learned during the process piping installation of a large industrial project:
Engineer should provide stuffing drawings for piperack erection.
Field run piping (shown on stuffing drawings) should also be shown on isometrics with dotted line.
Does anybody has a clue about "stuffed drawings"? What does it mean?
Thank you for the help.
Engineer should provide stuffing drawings for piperack erection.
Field run piping (shown on stuffing drawings) should also be shown on isometrics with dotted line.
Does anybody has a clue about "stuffed drawings"? What does it mean?