spd60
Civil/Environmental
- Nov 10, 2006
- 11
Trying to satisfy my curiosity.
Has anyone designed a petroleum pipeline where the client has required that it be designed and built to have specific grade with predetermined low points?
Has anyone designed a petroleum pipeline where the client has required that it be designed and built to have specific grade with predetermined low points?