Mario1815
I noticed you are in petroleum
Not knowing your specific application:
Recently, I was involved in a piping upgrade at a refinery facility. The owner required all piping which transported product to have pipe shoes attached. The reasoning behind the request was that in the future, if they had to transport a different product thru the line (after slight modifications, cleaning, etc) the line can be insulated if required. Hence, all spacing on the pipe racks had to incorporate allowances for insulation (3 in thickness) which resulted in some situations requiring a new level be added to the pipe racks. This particular client took a proactive approach that it was easier and less expensive to make provisions now than later when the space would not be readily available.
Just something different to consider depending on your application or future projects.