SteelPE
Structural
- Mar 9, 2006
- 2,759
Unfortunately I have not had much experience when dealing with pile foundation systems. Currently I am faced with designing my first pile foundation system. The building is a 30,000 square foot warehouse a portion of which will have a mezzanine. The slab live load is 250psf and the mezzanine live load is 125 psf. The piles are to be founded at least 4’-0” below grade for frost protection.
I have reviewed the geotechnical engineer’s recommendations on what type of piles to use (he gives 2 options steel and wood). However, in his report he does not give an uplift capacity or a lateral load capacity of each type of pile. I am wondering if this is normal.
Currently I am resisting the lateral forces in my building using concentrically braced frames. Some of which have large uplift loads. I can offset some of these loads by shifting my pile locations around pushing more slab dead load to the braced columns. Therefore, uplift capacity may not be that big of an issue. However, I am a little concerned when it comes to the lateral forces in the building. I should be able to rely on passive resistance to resist the lateral forces but shouldn’t I need a lateral pile capacity in order to develop this resistance (a force couple between the slab and the pile)?
I have reviewed the geotechnical engineer’s recommendations on what type of piles to use (he gives 2 options steel and wood). However, in his report he does not give an uplift capacity or a lateral load capacity of each type of pile. I am wondering if this is normal.
Currently I am resisting the lateral forces in my building using concentrically braced frames. Some of which have large uplift loads. I can offset some of these loads by shifting my pile locations around pushing more slab dead load to the braced columns. Therefore, uplift capacity may not be that big of an issue. However, I am a little concerned when it comes to the lateral forces in the building. I should be able to rely on passive resistance to resist the lateral forces but shouldn’t I need a lateral pile capacity in order to develop this resistance (a force couple between the slab and the pile)?