charliealphabravo
Structural
I am doing a proposal for reinforcement of a timber roof truss in an institutional building in Edmonton (built in 1949). It basically amounts to a fabricated steel bolt-on bracket as a proactive measure to prevent further splitting at a bolted joint. Could anyone with experience in the city share their experience as to whether a permit would be required or advised for these types of things? I spent the last half hour on the phone and the only human I was able to speak to said that, exact words, they hoped I might receive a call back from the Sustainable Development department in 10 BUSINESS DAYS?! (not shouting, just a bit exasperated)
Thanks in advance.
Thanks in advance.