aymanb
Materials
- Aug 6, 2008
- 5
I have high strength concrete cylinders that broke fine at 56 days yet cores taken of the same concrete came in below 85%, as low as 56% of specified strength. ASTM procedures were followed across the board during coring. Temperature has been mild since placement (within a range of 65 to 80 degrees F). Can anyone think of a reason for this?