Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations Ron247 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Parts List Strikethrough text and New Part order

Status
Not open for further replies.

vipinm2007

Aerospace
Oct 29, 2015
4
Hi,

I have a drafting of a assembly with several parts. The part list of the items are created with settings->
Grow Direction-Up
Automatic Update-Selected
Sort on Update-Selected
Lock Parts List setup
Create New Rows as Locked-Selected
Allow Manual Rows-Selected
Locked Deleted Rows- Strikethrough-Selected

Also i use this part list to auto-number the assembly.

When i replace a component of the assembly , the new component comes with same part number as the replaced part and the part disappear from the part list , whereas what i require is the old part to be striken-out with qty 0 and the new part to be added at the end of the part list.

I refereed old posts-
but still cannot make it work.

Thanks,
Vipin
 
Replies continue below

Recommended for you

Hello Vipin,

Right-click and select to lock the parts list row before you replace the component and then "delete" the parts list row. You will get a strike-through cancelled item.



~Felicia H.
NX 9.0.2.5

"Design all things as simple as possible but not simpler."
 
Hi Felicia ,

Thanks for your reply.
I have resolved the issue in a similar manner u mentioned.
Only difference is i am making a temporary copy of the part inside assembly before locking the row and replacing the part.
Then replacing one copy of the old part with new part (replace only 1 occurrence) and deleting the other copy of the old part.

The strikethrough will appear only when the part is deleted, not for replace (someone from Siemens told me so).


Vipin


 
Status
Not open for further replies.

Part and Inventory Search

Sponsor