Gentlemen,
I have a situation wherein I will be parallelling two 1500kW generators to feed the Emergency Power system at an airport terminal. The problem is that due to space and security issues, the client wants to locate the parallelling switchgear inside the building and the two generators outside in a secured yard. The distance is approximately 150' between the two areas.
Can any of you see problems with this installation? I normally like to locate these adjacent each other for maintenance and testing issues.
Do you see any Code/Safety/Operational/Synchronisation or other technical problems with this? I can't think of anything other than the testing issue.
Thank you and regards,
Jim Murillo
I have a situation wherein I will be parallelling two 1500kW generators to feed the Emergency Power system at an airport terminal. The problem is that due to space and security issues, the client wants to locate the parallelling switchgear inside the building and the two generators outside in a secured yard. The distance is approximately 150' between the two areas.
Can any of you see problems with this installation? I normally like to locate these adjacent each other for maintenance and testing issues.
Do you see any Code/Safety/Operational/Synchronisation or other technical problems with this? I can't think of anything other than the testing issue.
Thank you and regards,
Jim Murillo