Hi guys, just wanted to ask if my new gas turbine generator rated 11500kW, 6.6kV, 3phase, 50Hz, with an NGR can be paralleled with the existing GTG of 10800kW 6.6kV, 50Hz, 3phase, 50Hz also with an NGR. These gen set are use on offshore platforms.
Instrumentation, control and synchro of the GTG's are all in place. What will be the possible problems we may encounter?