Dear All,
At our power plant, we want to install the subject protection relay(s) in our 132 KV switchyard. The purpose is to open the 132 KV line breakers in event of under/over voltage and frequency to keep the power plant running in island mode. We have a single busbar scheme and two lines in parallel going to same grid station at remote end.
Should we conenct our new relay using Busbar PT or two relays on transmission line using line PTs.
Please suggest the pros and cons of both.
Thanks in advance.
At our power plant, we want to install the subject protection relay(s) in our 132 KV switchyard. The purpose is to open the 132 KV line breakers in event of under/over voltage and frequency to keep the power plant running in island mode. We have a single busbar scheme and two lines in parallel going to same grid station at remote end.
Should we conenct our new relay using Busbar PT or two relays on transmission line using line PTs.
Please suggest the pros and cons of both.
Thanks in advance.