wds1
Structural
- Mar 22, 2004
- 29
What methods are other engineers using for stormwater POST contruction water quality for 1 to 5 Ac sites. It seems that Extended Detention is the simpliest to adapt to our existing methods of detention. It requires 1" dia. orifices(metering water for 48 hrs.)which need to be protected by riprap. Most of the other methods require permanent pools and wetlands. I don't think they are going to go well with owners.