While I was joking with the hammer on a serious note CEL is right, they do require periodic calibration and can give misleading results if used without training or experience. For example, a strike on aggregate or on the finished surface of old concrete can give VERY high numbers that are not representative of the real strength.
Maine EIT, Civil/Structural.