By way of reference, a handicapped ramp is sloped at 1:12 which is 8.33%. The suggested 6" in 10' is a 5.0%, which I think is a bit steep around the house IMHO. The 1% - 2% should be fine.
Yes, you definitely want to cure the slab. After finishing the slab, wet cure it for 3-7 days by covering it with a 6 mil. clear poly. I would also spray water over the poly. to help keep the temp. down during the summer heat. The clear poly can sometimes leave "fold marks" on the concrete, which should wear off in a few weeks/months. After the 3-7 days use a high solids, non-yellowing cure & seal compound. Firms like Sonoborn, R.W. Meadows, and Master Builders all have good ones sold in gallon containers. Follow their directions!