dianium500
Structural
I have a detached addition where the existing columns of the pool deck are conflicting w/ the new foundation. The existing columns are on a deep pile, while the new addition will be on spread footings. I am able to avoid one of the columns, but not the one going through the main foundation. Anyone have any suggestions on how to deal w/ this conflict?