OneStepBehind
Structural
- Sep 23, 2010
- 14
I do not have a copy of the latest NEC code. Does it now require that all electrical main services be placed in a room all their own or does it depend on the voltage/amperage rating on the service? An electrician told me he thought it does. I am looking to do a new 400 amp 120/208v 3 phase service.
Thx
Thx