Withdrew too fast. Or throttled the pump back at that level and grout flow stopped. QA should have strokes and rigs should have AME/PIR to verify. It's possible they sucked down the pile on the next one and topped off later...QA should be catching that and reporting. Wrote this before reading all the replies, so that's my take and think many of you are of same opinion now that I just read a few replies. In the end, the contractor should be responsible for their work.