aombr
Petroleum
- Sep 8, 1999
- 13
Could someone help me? I'm a bit confused respect to this pipe spec I found:
PIPE SIZE / SCHEDULE OR THICHNESS: 219.1 / Sch.40MW
The question is: what means "MW" in this spec?
Thanks
Amaro O. Moraes
Rio de Janeiro - Brasil
aombr@yahoo.com
PIPE SIZE / SCHEDULE OR THICHNESS: 219.1 / Sch.40MW
The question is: what means "MW" in this spec?
Thanks
Amaro O. Moraes
Rio de Janeiro - Brasil
aombr@yahoo.com