vball85jb
Military
- Jun 27, 2011
- 57
I have some questions hopefully someone with more NX/Teamcenter experience can help out. All I got was crickets on the Siemens forum. We want to define some commercial parts, for this example a RF cable 12" long with sma connectors on each end. We do a lot of cabling so this cable or others similar will be used in hundreds of various configurations.
Is it possible to have a deformable assembled cable and use the electrical routing path to define the cable as well as the mating location of the two end connectors.
In reviewing online training (using the brake line as the deformable cable) it only is the tube. Do you make the tube the commercial part and add the connectors to the assembly? In this case how do you define the BOM since it is driven from the CAD data for the two files since the connectors should really be at the commercial part level?
I tried creating the cable as a sub-assembly part constraining the connectors to the ends of the deformable cable but when I put this part into the NHA the cable routes correctly but the two ends are located in space on the xyz coordinates from the sub assembled level.
Or vis versa if you use exclusively the electrical routing how do you define all the new parts as just variations of one commercial part?
Is it possible to have a deformable assembled cable and use the electrical routing path to define the cable as well as the mating location of the two end connectors.
In reviewing online training (using the brake line as the deformable cable) it only is the tube. Do you make the tube the commercial part and add the connectors to the assembly? In this case how do you define the BOM since it is driven from the CAD data for the two files since the connectors should really be at the commercial part level?
I tried creating the cable as a sub-assembly part constraining the connectors to the ends of the deformable cable but when I put this part into the NHA the cable routes correctly but the two ends are located in space on the xyz coordinates from the sub assembled level.
Or vis versa if you use exclusively the electrical routing how do you define all the new parts as just variations of one commercial part?